Current Strategic Priority
Hambantota BESS Development
Two utility-scale Battery Energy Storage System projects near Hambantota Grid Substation, each planned at 10 MW / 40 MWh and connected to the 33 kV grid.
2 x
Hambantota BESS projects
10 MW
Power capacity per BESS project
40 MWh
Energy storage per BESS project
33 kV
Grid connection target
Storage-Led Grid Support
Utility-scale storage can help absorb renewable generation, respond quickly to grid needs, and strengthen system stability.
Hambantota Location
The current priority is located near Hambantota Grid Substation, supporting efficient grid interconnection planning.
33 kV Connection
The projects are planned around 33 kV grid connection requirements, technical coordination, and reliable operation.
Strategic Development